DORIC STAVROS CONSTRUCTION INC.
  • HOME
    • SMALL PORTION OF MY BUSINESS BIOGRAPHY
  • RECOMMENDATION LETTERS
  • PHOTO GALLERY
    • Terra-cotta Camelback Copings Video
  • STAVROS' METHOD
    • GENERAL SPECIFICATIONS
    • Camelback Terra-cotta Coping Joints and Precast Coping Stone Joints Video
    • Terra-cotta Camelback JOINTS Video
    • STAVROS' NOTICE OF IMPORTANT SPECIFICATIONS
  • MY POEMS
    • 9/11 RIVER OF TEARS
    • VIRTUE
    • TRUMP & YOUNG IMMIGRANT
    • SPARTAN MOTHER
    • TRUTH
    • HOW SHALL I SAY IT
    • DONALD TRUMP
  • WOMEN SUPPORT
  • LIST OF CLIENTS
    • SMALL LIST OF TRUMP'S BUILDINGS
Picture

                                                                                                        General Specifications

No one asks the questions: "Why are the parapet walls and the brickwork leaking and damaged? Why is the roof work damaged?" No one asks such questions. And 99% of the time the roofs are damaged and are leaking right by the parapet walls. All these damages originate from the coping stone JOINTS or from the terra-cotta coping JOINTS.                                                               


For the last 40 years or so I’ve been crying my heart out to all my clients to educate them that all the damages on the roof, and on the parapet walls, begin from the terra-cotta camelback coping JOINTS and from the precast coping stone JOINTS. By allowing water to penetrate through the joints, the roof and the brick work below become damaged.

"During the 1970s and early 1980s we completed painting more than 500,000 windows and more than 100,000 fire escape baskets a year throughout the metropolitan area."

EXTERIOR WORK – THROUGHOUT THE ENTIRE PROJECT, FRONT AND REAR ELEVATIONS (INCLUDING WEST AND EAST ELEVATIONS) STARTING FROM ROOF PARAPET COPING STONES ALL THE WAY DOWN TO THE GROUND FLOOR, INCLUDING EXPOSED  FOUNDATION WALLS. 

ALL BRICK WORK AND BRICK JOINTS OF ALL ELEVATIONS AND STONE WINDOW SILLS ARE
TO BE REPAIRED AND WATERPROOFED.

REPAIR AND WATERPROOF ALL CHIMNEYS, BULKHEAD, AND ELEVATOR ROOM.

ALL FIRE-ESCAPES, IRON WORK, METAL WORK SUCH AS SKYLIGHTS, METAL DUMBWAITERS,
METAL CHIMNEYS, ROOF VENT PIPES, ROOF DOORS, GROUND AND ROOF FLOOR RAILINGS, GROUND FLOOR STAIRCASES, STEEL LINTELS ABOVE WINDOWS, TO BE TREATED AND COMPLETED AS INDICATED IN THE SPECIFICATIONS BELOW.

          
            GENERAL CONDITIONS - PART I

-      Contractor will take full responsibility and precautions to protect all property from       any 
damages.                  

-   
Contractor will supply all necessary equipment, including hanging-swinging
      scaffolding, 
Bos’n chair, hoisting and rigging equipment, labor, materials and
      license. Sidewalk 
bridging is not included.

- 
      Sidewalk bridging, permits and filing fees are not included.

-
      Contractor will comply with all safety regulations as required by OSHA.

-
      Contractor will not be responsible for existing TV antennas and satellite dishes.

-
      Not responsible for drains which are presently clogged, before work commences.

-
      Not responsible for any cracked or broken glass before work commences.

-
      In the event of an accident that causes glass to be cracked or broken, the glass will be       replaced immediately or temporarily sealed with plywood until new glass arrives             and is ready to be restored.

-       All drains will be protected and maintained clean at all times during construction.

-
     All work shall be executed by skilled mechanics and first class craftsmen that are            covered under workers' compensation, public liability, disability, vehicle insurance          and property damage insurance.

-
       Existing roofing will be covered and protected with protection boards to avoid                  damage during construction.

-
     The premises and the job site shall be maintained in a reasonably neat and orderly                 condition and kept free from accumulation of waste materials and rubbish during           the entire construction period. Crates, cartons and other flammable waste materials       or trash from the work area will be removed at the end of each working day.

  A. SCOPE OF WORK: POINTING WORK
      

     - POINTING WORK: REPLACEMENT OF CAMELBACK COPING STONES.

            WATERPROOFING  THROUGHOUT ALL PARAPET WALLS ON BOTH SIDES
       (INCLUDING THE ENTIRE FRONT AND REAR 
ELEVATIONS).
 
 
    1.    Rake out all loose, cracked and deteriorated mortar between brick joints, coping                     stone joints, decorative stone joints, stone windowsill joints, including joints with                     hairline cracks and any other defective joints throughout the ENTIRE                              PROJECT. All joints will be cut carefully, not to damage existing bricks or                      stonework.

    2.    All defective brick and stone joints will be cut with a diamond blade to a minimum          depth of ¾” or deeper, if necessary, or until we hit a sound surface by using an                  electric grinder.

 
       3.    The elevations as mentioned above on suspected areas are to be hammer tested in                    order to detect any loose or defective bricks or stone work.

      4.
    Remove loose and defective bricks at the front and rear elevations as indicated               above; no more than 400 bricks.

         5.    Remove all old mortar throughout rear parapet walls prior to installation of new                     terra-cotta camelback coping stones.

         6.  Contractor is to hammer test parapet walls facing the roof and to remove any                   loose and
defective existing stucco work and defective bricks.

         7.  Remove all loose particles, all dust and debris prior to new repairs.

 
        8.  After all cutting and raking is complete, all open brick joints and cracks                           throughout elevations and open surfaces, as indicated above, shall be thoroughly             washed with 50/50 Muriatic Acid*. In order to remove all build up, mildew,                     carbon and dirt from structure surface and joints, a stiff brush dipped into the                 acid will be used to scrub brick joints, stone joints AND ALL SURFACES                         NEEDED. Then it will thoroughly be rinsed with 3,000 lbs. of water pressure to               provide a clean surface for good bonding (this is not a restoration cleaner). Extra             precautions will be taken not to damage existing windows and doors.

 
     9.     Sample is to be performed for the owner’s review and approval prior to                                                  
commencing work, if necessary.

        *25% Muriatic Acid and 75% water deeply cleans the pores of the structure and               provides a very clean surface for the appropriate bonding. It works exactly the same       way as peroxide works on a wound. However, it is not strong enough to create any           severe damages, but removes mildew, carbon monoxide and other dirt from the               structure very thoroughly before pointing or any other repairs or patches. Even the        material manufacturers highly recommend this.

Note: I would like to stress that without first cleaning the surface very thoroughly,                                     any kind of pointing work or cement work or repairs on brick walls or concrete                         surfaces will never adhere and bond properly. The enormous amount of                            material and workmanship will be wasted.  Therefore, I strongly recommend to              all my clients that the surface must be washed thoroughly before pointing or any              other repairs or patches.  Even the material manufacturers highly recommend                this.

         10.     Apply a coat of Bonding Agent wherever it is necessary prior to repairs.

          11.    Parapet walls, facing the roof, which are presently covered with waterproofing                 stucco work, are to be repaired with waterproofing materials. After all                             necessary repairs have been completed and thoroughly dried, contractor is to                 apply two applications of Thorolastic fine, following the manufacturers’                         recommendations and instructions. Each application will be a different color in              order for the owner to differentiate each and every application. (see specs                          attached)

           12.    Contractor is to install new coping stones as described in the attachment titled                        STAVROS’ METHOD – TERRA-COTTA CAMELBACK COPINGS AND                 PRECAST COPING STONES – IMPORTANT NOTE. (See copy and pictures               attached)

           13.    Existing chimneys are to be 100% repaired and waterproofed and to be treated               as  follows:

            a. Cut existing roofing materials straight and level, up to the existing termination                 bar on all four sides of chimney walls. (See pictures attached)

            b. Install termination bar on all four sides of chimney walls as indicated in the                      picture enclosed.

                       c. Remove all the roofing materials down to the bare masonry structure.

             
d.  Repair structure as necessary with waterproofing materials.

             e.  Stucco all four sides of chimney walls.

             f. Remove all loose and defective material around chimney flue terra-cotta                          tubing’s.

             g. Install new waterproofing materials around all terra-cotta flues.

             h. Repair and waterproof existing chimney coping stones.

             i. Seal new termination bar with NP-1 Sealant, prime top portion of the                              termination bar with Primer 733 prior to installation of NP-1. (see specs                           enclosed)

              j. After all necessary repairs to the chimney, apply two applications of                                  Thorolastic. Each application will be a different color in order for the owner                    to be able to differentiate each
application.

           14.    After all preparations are completed, brick joints, stone joints and other                          openings will be filled with a balanced mixture containing Portland                                   Waterproofing Cement, clean, fine sand and Acryl 60 by Thorosystems                              Products or Dry-joint, following manufacturers’ recommendations and                              instructions. (see specs enclosed)

Note: All pointing work on brick and stone joints will be done neatly without                           cement smears. All pointing work will be tooled into the joints with a                                professional brick jointer (all bricks will remain 100% clean from any foreign                 materials). For more information regarding the neatness of our pointing work,                 you may contact Leonard Rampulla, Rampulla Associates Architects, Staten                     Island, NY (718-987-1310). You may also review projects that we                                         have finished in the past.

           15.    After all necessary repairs and pointing work have been completed and                          thoroughly dried, contractor is to apply two applications of MasterProtect                      EL-750, following manufacturers’ recommendations and instructions on                          elevations as indicated above, to prevent future water penetration.                                      MASTERPROTECT IS BREATHABLE (see specs enclosed).

               16.   All windows, doors, bricks and stonework will be free of cement smears.

                  

  Β. SCOPE OF WORK: RESTORATION, REPAIRS, WATERPROOFING,
       SCRAPING, RUST-PROOFING, AND PAINTING, FIRE-ESCAPES AND ALL  
       OTHER MISCELLANEOUS IRON WORK THROUGHOUT PROJECT TO BE   
       TREATED AS FOLLOWS

    1. Contractor will protect the public and workmen from lead dust and lead paint
         chips by dressing fire-escapes' elevations with a blue tarp.   

    2. Contractor will dress all windows with drapes as the law requires. Contractor will
         take all necessary precautions to collect all paint chips and scrapings from the job
         site and legally dispose as required by EPA guidelines.

    3. Contractor will install plastic covers beneath the fire-escapes to collect all paint
        chips and other debris from falling into the ground or gardens.

    4. Contractor will notify all occupants in writing, as the law requires, to have all
        windows closed tightly to prevent any scraping particles from blowing into the
        apartments.

    5. Contractor will notify all occupants in writing, as required by law, to have all air    
        conditioners shut off during scraping time only. 

    6. Contractor will protect and tightly cover air conditioner sleeves that are located on
        fire-escapes.

    7. Notices will be placed in elevators and all public hallways by contractor, notifying
        occupants that lead paint removal will take place on fire-escapes and other exterior
        areas. (SEE  SAMPLE OF NOTICES ATTACHED)


    8. Contractor will place caution tape in work areas, as necessary.

    9. Playgrounds and other outdoor recreation areas must be closed down by owner
        during performance of scraping only if playgrounds are located within 15 to 20 feet
        of scraping work area.

   10. If fire-escapes are located above any entrance, that particular area must be closed 
         during performance of work and alternate access must be used.

   *CONTRACTOR MUST HAVE FULL COOPERATION OF OWNERS AND
     OCCUPANTS DURING PERFORMANCE OF WORK.*

    11. After all necessary preparations and protection takes place, the contractor will
         thoroughly wet-scrape all loose paint and scaling particles. All scraping work will
         be wet prior to scraping as recommended by HUD-Sponsored Lead-Safe Work   
         Practices  Training. (Wet scraping is mandatory to prevent lead dust from flowing
         into the environment). THIS IS NOT A STRIPPING. THIS IS ONLY MANUAL
         SCRAPING.


    12. Contractor is to hammer-test with a heavy hammer each and every fire-escape
          step. If bolts and nuts are rusted or damaged they are to be replaced following
          New York building codes ASTM, OSHA Fire Department requirements (no more
          than 24 bolts and nuts for a project of 48 fire-escape baskets).


    13. Wet wire brush will be used to remove all rust from metals.       
                                                                                
    14. Clean up all dust and debris before applying paint.

    15. Contractor to clean all dust and particles from windowsills, window sashes and
          any other areas where work is performed.

    16. A full coat of Non-Lead, Non-Toxic Industrial Rustproof Metal Rust Inhibitive 
          Bridge Primer Red will be applied.

    17. A second coat of Non-Lead, Non-Toxic Rustproof Gloss Bridge paint (black or
         brown or color to be selected by owner) will be applied throughout fire-escape
         metal and iron work.

Note: I comfortably guarantee my exterior paint jobs for 7 years because I know it will
          last for 14 years. How do I know that? Because my steady clients call me back
          14-15 years later to repaint the fire-escapes for the same buildings.

Note: Contractor is not responsible if the existing fire-escapes are painted with latex
           paint. All the fire-escapes, since the beginning, were painted with lead oil based
           paint. I often come across landlords who hire amateur painters or teenagers to
           paint the fire-escapes; instead of using exterior oil based paint they use latex
           because it is easy to work with. Latex paint is harmful to raw iron work. The 
           latex paint will greatly increase the rusting process. If latex is applied on top of oil
           based the cracks rusting will occur. Moreover, if you apply oil based paint on top
           of latex,  the latex coat beneath will begin peeling due to the strength of the oil 
           based paint pulling on the latex. Similar situations occur on interior painting
           work as well.


   C. SCOPE OF WORK: FIRE-ESCAPE CONNECTIONS

         18. After completion, all fire-escapes connections at the brick structure are to be
           Sealed watertight with Sonalastic NP-1 by Sonneborn Building Products,
           following manufacturer’s recommendations and instructions.Color to match
           existing fire-escapes as closely as possible. (SEE SPECS ON THE ATTACHED
           LINK). http://www.homasote.com/Installation/SononlasticNP1_tdg.pdf

  
a. All fire escape connections in the structure are to be waterproofed and sealed
       watertight.

   b. Remove any loose caulking or loose mortar around fire escape connections and then
       clean all dust and debris.

   c. All open areas will be blown off by 350 lbs. of air pressure to thoroughly remove
       dust.

  
d. After all necessary cleaning contractor will apply one coat of Primer Clear 733 by
       Sonneborn Building Products (SEE SPECS ON THE ATTACHED LINK)

          http://ca.brockwhite.com/files/Resource/Prod_Data/0700391_733_Primer_Prod_Data.pdf

   e. On deep opened areas, contractor will install Backer-Rod by Sonneborn Building
       Products as per manufacturer’s recommendations and instructions (SEE SPECS 
       ON THE ATTACHED LINK). http://www.anchsand.com/Portals/3/backerrod_overview.pdf


      f. After cleaning and Primer 733 installation, apply Backer-Rod by Sonneborn
      Building Products with a skinny brush into the openings.

   g. After Backer-Rod and Primer 733 has been completed, contractor is to seal all
      connection openings with Sonalastic NP-1, color brown or color to match the color
      of the fire escapes or color of the existing brick joints as close as possible. (SEE
      SPECS ON THE ATTACHED LINK) http://www.homasote.com/Installation/SononlasticNP1_tdg.pdf


NOTE:  THROUGH ALL THE YEARS OF MY EXPERIENCE, I HAVE COME
               ACROSS QUITE A FEW TIMES THAT FIRE-ESCAPE BASKETS ON
               SOME OLD  BUILDINGS HAVE A TENDENCY TO FALL OFF OF A
               BUILDING DUE TO FAILURE OF MAINTAINING THE FIRE ESCAPE
               CONNECTIONS WATERTIGHT AND BECAUSE OF MANY YEARS OF
               NEGLECT, RUST  FORMS, AND THE CONNECTIONS HAVE BEEN
               EATEN AWAY. THEREFORE, I RECOMMEND TO ALL MY CLIENTS TO
               MAINTAIN FIRE-ESCAPE CONNECTIONS WATERTIGHT AT ALL
               TIMES. (95% OF THE TIME ON THE OLD BUILDINGS, ESPECIALLY
               THE LANDMARK BUILDINGS THAT I’VE WORKED ON, THE FIRE-
               ESCAPE CONNECTIONS ARE MOSTLY LOCATED BY THE KITCHEN
               WINDOW). THEY HAVE ONLY TWO COURSES OF BRICKS DUE TO
               THE FAILURE OF MAINTAINING THE WINDOW FRAMES
               WATERTIGHT, WATER PENETRATES THROUGH THE BRICKS AND
               CORRODES THE MAIN CONNECTIONS OF THE FIRE-ESCAPES,
               WHICH MAKES IT VERY DANGEROUS.) (See pictures of fire escapes
               connections)


   19. All paint applications will be applied with mitten, roller and brush and with no
         holidays.


   20. All brick elevations, windows, doors and other unpainted areas to be maintained
         free of paint drops.



   D. SCOPE OF WORK: EXTERIOR WINDOWS

        - SCRAPING, GLAZING PUTTY, CAULKING, ONE COAT OF PRIMER                                         YELLOW, FINAL COAT OF EXTERIOR BENJAMIN MOORE GLOSS TRIM,                    COLOR TO BE SELECTED BY OWNER, OIL BASE. CONTRACTOR TO                                  SUPPLY ALL NECESSARY SCAFFOLDING AND EQUIPMENT TO                                                  PERFORM THE  FOLLOWING WORK:

     
1.    Thoroughly scrape all loose paint and scaling particles throughout.
   
    2.  Remove all loose caulking around windows frames.
   
    3.  Remove all loose & defective putty from around windowpanes.
   
    4.
    Wire brush will be used to remove all rust from steel lintels or any other metal                 work, wherever is necessary.
 
     5.  Clean all dust and debris before applying paint.
   
    6.  Then apply one coat of oil-base linseed oil primer sealer, color yellow. Therefore,               owner
will be able to determine the difference between paint applications.
  
    7.  Heavy duty linseed oil putty will be used around windowpanes to a smooth even              finish, wherever necessary.
  
    8.    Sonneborn Backer-Rod will be used to fill all large openings around window                    frames, if necessary (see specs enclosed)
   
    9.    Primer 733 will be applied with skinny brush into the openings around window                frames and windowsills prior to the NP-1 Sealant (see specs enclosed).
 

    10.
  All window frames will be caulked with heavy duty caulking, NP-1 (white), by                                Sonneborn Building Products (see specs enclosed),
 
    11. All wooden windows will be painted with a white primer and after the primer is
                         completely dry we will re-erect the scaffold in the same area to apply the final                   application of the selected final color. A responsible person from the board of                   directors must be present to witness the primer applications prior to final coat.
 
    12. A second (top quality) BENJAMIN MOORE GLOSS TRIM will be used                           throughout 
(
see specs enclosed), House and Trim.
 
    13. All paint applications will be applied evenly with no sacking, blemishes, runs and             no 
holidays.
 
    14.  All windowpanes will be free and clean of paint.
 
    15.  All brick elevations to be maintained free of paint drops.
 
    16.  Not responsible for windows that presently cannot be opened.  Owner is to                        inform 
residents to play with the windows by opening and closing to prevent                    stickiness.
 
    17.  If the windows are stuck it’s the owners’ responsibility and not the contractor.
 
    18.  All windows must be kept open by the owners a 1/2 inch on top and ½ inch on                  the 
bottom to prevent stickiness. Owner is to place notice in the elevator during                work performance to notify all residents.
 
    19.  Not responsible for blind spots by window tracks and storm window frames                      facing the 
interior.
 
    20.  After the completion of the painting, contractor will clean all the paint from the
                          windows glass and wipe off dust free.  If the owner desires to clean the exterior                part of the windows with paper towel and glass-plash, it will be an additional                    charge of $25 per  window.
 
    21.  If broken glasses are in need to be replaced, it would be additional charge of $65              per 
window pane.
 
    22.  Contractor will provide the owner with a report of all the broken or cracked                    glasses prior
to the work beginning. Owner must provide access to each and                      every apartment for inspection of the existing windows.
 

    23.  Broken or cracked glasses are not visible from the ground.
 
    24.  If the contractor broke the glass by mistake, the contractor will replace it                          immediately, 
and no extra charge.

        NOTE: OCCUPANTS MUST REMOVE ALL AIR CONDITIONERS FROM                             WINDOWS IN ORDER TO HAVE WINDOWS PAINTED COMPLETELY
           

        *FOR ABOVE WORK - FIVE (5) YEARS GUARANTEE ON LABOR AND                                 MATERIALS.*

  E. SCOPE WORK: ROOFING

        - MAIN ROOF TO BE STRIPPED AND REPLACED INCLUDING STAIRCASE                     ROOF BY BULKHEAD; APPROXIMATELY 2,988 SQ FT.

    1. Remove and dispose of all existing roofing materials down to the original wood                 decking.
 
    2. Remove and dispose of all pitch pan pockets from around vent pipes and other
                           extrusions on roof.
 
    3. Remove and dispose all base flashings by parapet walls and wood decking.
          
                *NOTE:  EXISTING COPPER CAP FLASHING IS TO REMAIN.*

    4. Thoroughly clean all dust and debris before applying roofing materials.

    5.  Install new drains, as recommended by roofing manufacturers and as indicated on
                 
sketch.  (see sketch enclosed).

NOTE:  Ventilation system is very important to let the moisture escape from
within the
               roofing system.  Moisture begins at the basement and rises all the way
  up to the
               roof. During the hot weather, moisture gets trapped under the roofing
system
               and becomes steam.  This causes the roofing system to raise and separate
from
               the roof decking.  It creates bubbles, blisters, and many inflated areas in the
                                    roof and causes a great deal of damages on the roof.

         In addition, if it is wood decking, the moisture corrodes the wood decking and                              rafters.  Therefore ventilation is very important. If it is a concrete decking, the                              moisture which is trapped inside the concrete decking damages it and makes it                              brittle.  At the same time, the roofing system gets ruined.

     6.  Remove corroded and damaged wood panel decking.  Repair and replace with new
                waterproof and fireproof plywood to match existing decking in thickness and                    to be finished even and flushed to the existing wood decking.  NO MORE THAN              10% OR 300 SQ FT. OF THE ENTIRE WOOD DECKING. 
       
           
                            *NOTE: Major repairs to be paid extra over and above estimate.*
   
    7. All roofing installations will start at the lowest point of the roof and by the drains
                     towards the highest point.
   
    8.  All roof work will pitch towards drains and scuppers.
   
    9.  After all necessary preparation and cleaning, button down a heavy duty                            FIBERGLASS 
BASE SHEET with fasteners on wood decking.
   

   10.  Final application of modified bitumen roofing membrane mineral surfaced white
                   granules rubber base. Will be applied throughout the entire roof.

 
  F.  SCOPE OF WORK:
FLASHING AND ACCESSORIES 

            - 99% OF ROOF DEFECTS AND LEAKAGES START FROM THE FLASHINGS                   AND PARAPET WALLS.

     
1. LIFT AND RAISE EXISTING COUNTER COPPER CAP FLASHING.                           REMOVE ALL EXISTING ROOFING MATERIALS, INCLUDING ALL BASE           FLASHING. INCLUDING ROOFING CANT STRIP, ALL THE WAY DOWN               TO THE BRICK WALL AND TO THE ROOF DECKING.
   
    2.  Remove all existing base flashing down to the original roof deck.
   
    3. Repair base flashing, brick walls, and roof decking by parapet walls where ever
                       
necessary.
   
    4.  Thoroughly clean all dust and debris before applying flashing materials.
   
   
5.  Install copper base flashing throughout all perimeters of parapet walls and roof               decking. Then apply one heavy application of roof primer asphalt.
  
    6.  Install cant strip with quick drying asphalt roof coating at corner between parapet                  
walls and roof decking at base flashings.
   
    7. Apply a heavy layer of roof primer coating over and above cant strip by parapet             walls, 
and roof decking.
   
    8.  Install 2 tough plies, #60 ply sheet, with asphalt.
   
    9. Final application of modified bitumen roofing membrane mineral surfaced white             granules 
rubber base. Starting approximately 20 inches above the roof surface and         terminated right  beneath copper cap flashing.  
 

    10. Install termination bar with fasteners over base flashing and to be terminated                  beneath 
counter copper cap flashing.
 
    11. All termination bars will be sealed with NP-1 by Sonneborn Building Products.                (See 
specs enclosed).
 
    12. Existing copper cap flashing is to be re-installed after the completion of                             termination 
bars. 
 
    13. Cap flashing will be installed a maximum of 1-1 ½” into the structural walls.
 
    14. All copper cap flashing will be sealed with NP-1 (see specs enclosed).

 

    15. Install pitch pan pocket in mastic around vent pipes, then to be filled with one half           with 
no shrink concrete, and the remaining to be filled with quick seal pourable               sealant by US Intec recommended by owner (see specs enclosed).
 
    16. Project site will be inspected by contractor during work performance.
 
    17. See roofing flashings installations sketch enclosed.
 
    18. All roof work will be 100% completed according to the manufacturers                               recommendations 
and instructions as specified on updated specifications and                   recommendations by roofing.
 
    19. All work will be inspected during work performance by roofing manufacturers               and 
roofing contractor.

FOR ALL ABOVE WORK – 25 (Twenty-Five) YEARS GUARANTEE ON LABOR         AND MATERIALS WITH AN AGREEMENT THAT ALL CAULKING BY COPING  STONES TO BE REPLACED EVERY SIX TO SEVEN YEARS AND YEARLY                     ROUTINE INSPECTIONS AND MAINTENANCE OF PARAPET WALLS AND                 CHIMNEYS. 

    GENERAL CONDITIONS – PART II

-   Contractor will make sure that all cracks and openings, as specified above, will be           100% 
sealed and masonry walls are   able to withstand wind-driven rain (Solely the         work done by contractor).

-   Contractor is not responsible for any damage to window screens and storm windows. 
        Residents throughout the entire  building must remove all window screens and storm         windows (if necessary) before work commences and be reinstalled after work is                           completed.

-   Not responsible for any non-visible conditions within the structure.

-  
Not responsible for any non-visible conditions underground, such as boulders, large       roots, or any other hidden structural objects or piping.

-   NOT RESPONSIBLE FOR ANY NON-VISIBLE CONDITIONS THAT ARE NOT       CLEARLY VISIBLE FROM THE GROUND LEVEL.

-    Not responsible for removing asbestos or other hazardous materials.

- 
   Not responsible for paint drops or paint smears on brick surfaces caused by previous       contractors.

-    Not responsible for paint drips or runs caused by previous contractors.

-    Not responsible for defects or damages caused from previous contractors.

-    Contractor is not responsible for bushes, shrubs, flowers or any other plants that are      close 
to the structure and interfere with the work.  If any protection is required it            will be at the expense of the owner. If the owner decides to have our company do the        necessary protection, there will be an extra charge over and above this estimate.

-     Breathable materials will be used throughout all masonry work.

-    All materials will meet and comply with federal specifications and requirements.

-    All material will be approved by ASTM testing methods.


-
       All workmanship and materials shall be first class and best of their respective kinds        in complete accordance with the specifications.

-    All materials shall be delivered in original containers and packages bearing                      manufacturer’s name and brand with labels intact and seals unbroken.

-   All materials will be applied according to the manufacturer’s recommendations and       instructions.

-   Materials delivered to the job site but not yet incorporated in the project shall be             neatly 
piled and properly protected.

-   All work will be performed by first-class mechanics, using best-made tools and                 equipment.

-   All work is covered by workmen’s compensation, liability and disability insurance.

-   Any alteration and deviation from the above specifications involving extra costs shall
    become an extra charge over and above the estimate.

-   All work performed by contractor, whether “charges” or “no charges”, must be               acknowledged and signature accepted by owner, management agent, or any other           
representative of the project.

-   Owner shall supply contractor with electricity, water and EMPTY safe storage room     to store all necessary equipment  and materials during the work performance.  In the     event that  no empty safe storage room is available, contractor  will have to rent a           trailer and owner  will be responsible for the cost over and above the estimate.Owner     shall  supply contractor wash room, toilet and slab sink.

-   The warranties do not apply to results from:  future settlement or expansion of the         structure, any settlement cracks, accidents, fire, other casualties or other physical           damages resulting from any future interior or exterior renovations.

-   All warranties will commence from the date of completion.

-   All warranties and guarantees apply and relate solely to the work done by the                 contractor.

-   In order for all guarantees to be in effect, all the structures above the work we
                performed and completed must  be maintained 100% watertight.

-   All drains will be protected and maintained clean at all times during construction,           after job is completed and contractor leaves the job site, owner must maintain all             drains from clogging to prevent overflow. Not responsible for drains which are                 presently clogged, and 
before work commences.

-   In case of any changes in the work, or by labor strikes, lockouts, unavoidable                   casualties or other causes beyond the  control of the said contractor, then the time of       the performance or  completion of said work shall be extended.

-   The contractor shall remove litter, scrap and debris resulting from the operation and      shall keep the area of work “broom clean” at all times.


-    Prior to commencing any new work, the contractor shall clean all areas where it is           scheduled to start.

-    Care shall be taken by workmen not to mark soil or otherwise deface finished                  surfaces. In the event that any finished surface becomes defaced, contractor shall            clean and restore such surface to its original condition.

-   Conduct cleaning and disposal operation in accordance with local ordinances,                 applicable 
codes and regulations relative to safety, insurance standards, anti-                   pollution laws, and 
owner’s requirements.

-  Remove waste materials, debris and rubbish from the job site and legally dispose   at       legal 
public or private dumping  areas.

-     Owner agrees to perform yearly inspections of parapet walls and throughout all              brickwork, ESPECIALLY COPING STONE JOINTS AND AROUND CHIMNEY          FLUES. Any abnormalities are to be reported to the contractor.

-     Not responsible for any belongings left on balconies, fire escapes, or penthouses.                Tenants
  or owners should remove such belongings from such locations.

-     Not responsible for honest typographical errors.

-     Not responsible for honest incorrect calculations or any other honest errors.

-    Owner shall have available responsible party representing owner at all times in case         of
emergency or changes during work process.

-    Upon acceptance of the contract, owner is to supply Contractor with a TAX                     EXEMPT 
CERTIFICATE OR  CERTIFICATE OF CAPITAL IMPROVEMENT.

-   All above prices are approximately estimated.  All work is subject to be re-                        measured/re-
counted.  If less work is  needed, allowances will be given to the owner.        If more work is 
needed, charges will be made accordingly.

-    If hazardous conditions or loose or deteriorated areas are found, such as loose                  bricks, 
loose cornices, loose ledges, loose window sills, loose and defective lintels,              loose air conditioner sleeves, loose air conditioner brackets or any other loose or              deteriorated and defective structural areas, especially if the safety of the public is            involved, and they need to be repaired over and above the scope of work, contractor        has the responsibility to repair these areas to a legal and safe condition. Contractor          will notify owner of findings and there will be an additional charge over and above          the estimate based on the repairs made. If owner prevents contractor to proceed with      the repairs or if there is a refusal of payment, it will be the responsibility of the                owner and not the contractor.  Moreover, due to refusal of repairs, in the event of an        accident due to falling defective structural materials, contractor and his insurance          carriers will be held harmless and owner will assume all responsibility.

-    Contractor is not responsible for any findings during or after pressure washing of                structure.

-   Contractor is not responsible for damages due to heavy winds and hurricanes.

-   Contractor is not responsible for owner, tenants, residents or pets stepping on wet            paint or
 plastering and tracking it throughout the building or apartments causing            damage to flooring or carpeting. Caution must be taken or shoes should  be                      removed.

-    If doors are painted, they must stay open until dry. If individuals close their doors,          they 
do so at their own risk, and  contractor will not assume responsibility.

-   CONTRACTOR IS NOT RESPONSIBLE FOR EXISTING AIR CONDITIONERS
            NO MATTER THE  CIRCUMSTANCES.

-   Contractor is not responsible for air conditioner sleeves if they are corroded and if
                water penetrates through the structure from the corroded air conditioner base                             (plates).

-     All above specifications and scope of work are subject to changes depending on                findings 
during preparation and  demolition or on any findings during performance        of work.

-  Contractor will have the rights to use freight elevator at all times during work
                               performance.  In case of complaints from neighbors due to dust or noise, contractor         will work after hours starting work at 5:00 pm or 6:00 pm and work throughout the       night. On many occasions, it is very possible contractor may work weekends. Owner       must provide 
access to the contractor as required.

-   If necessary, work is subject to be recounted after completion and charges will be           made a
ccordingly.

Note: I would like to stress that without first cleaning the surface very thoroughly,
                                     any kind of pointing work or cement work or repairs on brick walls or concrete surfaces will never adhere and bond properly.  The enormous amount of materials and workmanship will be wasted.  Therefore, I strongly recommend to all of my clients that the surface must be washed thoroughly before pointing or any other repairs or patches. Even the material manufacturers highly recommend this. 

Note: Cutting brick and stone joints requires great skill even more so than the expertise of brick layers or any other construction trade; if one does not know how to cut brick joints or stone joints, they will cut and destroy the bricks and stones. Cutting brick or stone joints requires experience and great skill.

FOR ALL ABOVE DESCRIBED WORK, FIVE (5) YEARS GUARANTEE ON LABOR     AND MATERIALS.

 

 